Beyond The Sprues
Modelling => Group and Themed Builds => Canadian GB => Topic started by: apophenia on July 31, 2026, 09:40:35 AM
-
"Rules are for the obedience of fools and the guidance of wise men." Douglas Bader
Canadian Group Build - Rules
1 -- Duration: 01 Aug 2026 to 15 Nov 2026 PST (about tea time)
2 -- Subjects: Anything with a Maple Leaf or Canada-related
3 -- Formats: Physical model builds, Paint or Pixels, Stories, etc.
4 -- Vintages: Revived Shelve/File Folder of Doom entries welcome
5 -- AltHist: Are we not whiffers? So, absolutely, if Canada-related
6 -- Rule Six is identical the same as Rule Ten (qv)
7 -- Works in Progress: WIP documentation positively encouraged
8 -- Awesomeness: Essential. Bring on that Maple Leafy excellence!
9 -- Extensions: Well, possibly (praise/bribing of Moderator helps)*
10 - Sorry, I cannot remember Rule 10 but it may come back to me ...
__________________________________
* Moderator 'donation' forms available in pdf. Note: Paypal™ is our preferred method of donation.
-
And we're off on the Canadian GB!
Have fun everyone :D
-
Okay, just a heads up ... it is now 01 October west of the International Date Line.
So, folks, there's just 31-ish days to go on this Canadian Group Build!
-
If I put Aussie decals on one side of my Canadian Tornado F4 and maple leafs on the other can I enter it in the Antipodian GB on Whatifmodelers? ;D
Maybe I can put the decals on, take pics, then change them. I’m so clever! ;)
-
If I put Aussie decals on one side of my Canadian Tornado F4 and maple leafs on the other can I enter it in the Antipodian GB on Whatifmodelers? ;D
Maybe I can put the decals on, take pics, then change them. I’m so clever! ;)
Either way, Whatifmodellers.com is the senior site (since they've been around longer). As such, they should have developed greater patience in their maturity. So, beauty before age ... BtS goes first, right? ;)
-
If I put Aussie decals on one side of my Canadian Tornado F4 and maple leafs on the other can I enter it in the Antipodian GB on Whatifmodelers? ;D
Maybe I can put the decals on, take pics, then change them. I’m so clever! ;)
Either way, Whatifmodellers.com is the senior site (since they've been around longer). As such, they should have developed greater patience in their maturity. So, beauty before age ... BtS goes first, right? ;)
As one of the moderators of the "The Antipodean/ANZAC GB" over on What If Modellers, I accept that we have developed greater patience over the years but reject your assertion that we are less beautiful.
However, we are, also, awesomely magnanimous & shall let you have first dibs. ;)
-
First I have to finish the darn thing!
-
First I have to finish the darn thing!
Well, chop-chop, lad! Get a move on! ;)
-
... I accept that we have developed greater patience over the years but reject your assertion that we are less beautiful...
I states 'em as I sees 'em ;) ;D
-
The gentlest of reminders ... we are now into the final fortnight of this Canadian Group Build!
Godspeed and happy landings, folks :smiley:
-
I must respectfully submit my formal request for an extension to the deadline for this most auspicious of group builds. Other projects of monumental importance have conspired to delay the completion of the Canadian Tornado F.4 Interceptor.
In other words I’ve been doing house projects to keep SWMBO happy and prolong my life. I believe there are two finished physical models in the completed thread so I’m sure some other enthusiastic and talented but time challenged builders could benefit from such a bending of the rules.
-
I must respectfully submit my formal request for an extension to the deadline for this most auspicious of group builds...
Thanks for getting your extension request in early, Ken :smiley: (Others nearing completing will also feel less rushed now.)
... projects to keep SWMBO happy and prolong my life...
Very important considerations! How much extension time do you think you need?* (Others should chime in here, too.)
_______________________________________
* Note: Moderator approval of requested extension times will be heavily influenced by the generosity of 'donations'. (Cash, cheques, or money orders accepted, as always.) ;)
-
I want to say one week but I know better. Two would be more likely to produce a finished product. If that could be arranged. Much thanks in advance.
-
Can I get two weeks please?
On July 1, some parts of Ottawa got up to 200mm of rain in 6 hours. A 1 in 200 year event.
In my neighbourhood, residents got anywhere from a few inches of water in their basements up to 7 ft. We got 6".
Some local roads were under 4 feet of water.
We and many others had to empty our basements, remove damaged appliances, drywall, flooring, furniture etc and rebuild from scratch.
We are almost done our reno. My modelling room was a low priority.
-
This explains the Carl quietness! ;)
Hope it's all gone relatively smoothly with the restorations, Carl, & it's good to see you back! :smiley: :smiley:
-
Okay, I think we have agreement on extending the Canadian Group Build by two weeks. Since the second Wednesday of that extension is Remembrance Day, I have arbitrarily added an additional day to make up for muster and parade time.
So, the new deadline is the end of Sunday, 15 November 2026 PST.
... On July 1, some parts of Ottawa got up to 200mm of rain in 6 hours. A 1 in 200 year event...
Ooof! That is brutal, Carl :o
I remember some bizarrely extreme Ottawa summer downpours/cloudbursts ... but never anything as bad as that!
Echoing Guy, I too hope that all your restorations go well :smiley: Then, after a rest, it is bench time again! :D
-
Sometimes I think having a basement is more trouble than it could ever be worth. I’ve heard far too many stories of the basement becoming an indoor pool. The town I live in sits up on a hill so no big problems here but that much rain will damage everything. I hope everything works out for the better. Just don’t do like my old boss and put carpeting on the basement floor!
And thanks for the extension!
-
Sometimes I think having a basement is more trouble than it could ever be worth. I’ve heard far too many stories of the basement becoming an indoor pool. The town I live in sits up on a hill so no big problems here but that much rain will damage everything. I hope everything works out for the better. Just don’t do like my old boss and put carpeting on the basement floor!
And thanks for the extension!
Thank you for the extension Stephen.
As for basements in Canada, is more of byproduct of our geography/weather.
I should add we have lived in the same house for 38 years. This is the first we have had water in the basement.
• Below-Frost-Line Foundations: Builders must dig down 4 to 8 feet (1.2 to 2.4+ meters) or more to place the home's foundation footings, sewer lines, and water pipes below the local frost line. If the foundation sits in soil that freezes and thaws, the expanding ice (frost heave) can push the ground up unevenly and crack the structure.
• Practical Conversion of Excavated Space: Since workers already have to dig a deep hole to reach stable ground, it is cost-effective to build full walls and a floor inside that hole rather than just filling it back in with dirt.
• Mechanical Systems: Basements provide a central, protected space to house heavy utility and HVAC equipment—such as furnaces, hot water tanks, HRV units, and water softeners. Historically, large coal-burning furnaces also required a dedicated underground space.
• Natural Insulation: The surrounding earth acts as natural insulation, helping keep the home cooler in the summer and warmer in the winter.
• Extra Living Space and Income: Once excavated, the square footage is commonly finished into sorted by importance: modelling room, stash storage, books and other reference material, extra bedrooms, family rooms and storage
We live in a bungalow with 1,300 Sq Ft above grade. A finished basement almost doubles that.
-
Happy to accommodate, Carl ... especially in light of circumstances!
Your basement descriptions to Ken have me reminiscing about our place in the Glebe back in the day. That brick townhouse was built c.1922 and its foundation was mainly stone. That stone could shift around a bit (maybe frost heaves, mainly settling) but it was easy to repoint.
Our place was 2-stories above grade (so the basement added a third more area). Our basement was never finished - I used it as a workshop, modelling space, painting area, laundry room, plus a lot of storage. But I can still attest to your statement about natural insulation (it was the coolest place to be in the Summer!).
-
My basement is almost always 60-65 F all year round and it’s only half in the ground and half above.
-
My basement is almost always 60-65 F all year round and it’s only half in the ground and half above.
That makes sense. In Ontario, south of the Canadian Shield, the frost line is about 1.2 m down. Dig a bit further (1.2 to 1.8 m) and you get basic seasonal stabilization of ground temperatures. There are a bunch of other variables, of course - eg: soil solar gain on sloped lots with southern exposures; cover (vegetation or snow); water table and soil moisture content; etc.
-
My basement is almost always 60-65 F all year round and it’s only half in the ground and half above.
That makes sense. In Ontario, south of the Canadian Shield, the frost line is about 1.2 m down. Dig a bit further (1.2 to 1.8 m) and you get basic seasonal stabilization of ground temperatures. There are a bunch of other variables, of course - eg: soil solar gain on sloped lots with southern exposures; cover (vegetation or snow); water table and soil moisture content; etc.
About the same here Ken.
I keep the basement air vents closed during the summer.
I use a Heat Recovery Ventilator (HRV) in the winter to stabilize the humidity and bring into the house some oh so yummy arctic air.
My A/C does the de-hum in the summer.
-
Okay, I think we have agreement on extending the Canadian Group Build by two weeks. Since the second Wednesday of that extension is Remembrance Day, I have arbitrarily added an additional day to make up for muster and parade time.
So, the new deadline is the end of Sunday, 15 November 2026 PST.
... On July 1, some parts of Ottawa got up to 200mm of rain in 6 hours. A 1 in 200 year event...
Ooof! That is brutal, Carl :o
I remember some bizarrely extreme Ottawa summer downpours/cloudbursts ... but never anything as bad as that!
Echoing Guy, I too hope that all your restorations go well :smiley: Then, after a rest, it is bench time again! :D
The "new" summer Ottawa weather now includes short but extremely intense down pours.
I have selected the kits I will race to finish.
Most are from the shelf of doom. IE partly started/painted.
Most will be one colour to speed up the build process.
-
Happy Halloween, folks! :D
Only two weeks to go in this extended Canadian Group Build :o
"Scary boys and girls!" - Count Floyd (Monster Chiller Horror Theatre)
-- https://www.youtube.com/watch?v=x2gVgujRCL4 (https://www.youtube.com/watch?v=x2gVgujRCL4)
-
Okay, this is our official announcement of one week to go, folks!
Barring requests for further extensions, the deadline for this Canadian GB is the end of Sunday, 15 November 2026 PST.
-
And, barring further requests for extensions, we are heading into the final day of the Canadian GB, folks!
-
Okay ... one final extension, folks. The Canadian Group Build will end on Tuesday, 17 November 2026 PST.
Polls for your favourites should be up by 18 November :smiley:
-
And that's all, folks! This Canadian Group Build is officially over ...
Or, it will be once you have all voted for your favourites!
10 - Sorry, I cannot remember Rule 10 but it may come back to me ...
I have remember Rule 10 - Voting is mandatory; it is your solemn duty to vote in the next 14 days; you get 3 x votes per category; and, you can change 'em (see, 'mandatory' can still be flexible).
-
Meanwhile in the background there is the sound of a ticking clock to the next GB Selection vote... ;)