A thorough manufacturing review was held it was determined that the head of the RF-102A project (me) was negligent in numerous areas was subsequently fired.
However since no replacement was found, he was rehired, given a strong verbal down dressing and told that the RF-106 must be completed in 12 months.
And good on the management! Such slackness cannot be tolerated!