Done a few things between other callings.
Cleaned hull sides by PSR of 1/225 portholes.
Main turret mount spots nearly smooth via PSR and primer.
Cut back bone off top of upper deck so its flat for mounting the bridge. Left mount for rear funnel.
Finding workable bridge has taken time. After much fuss am trying something different. Cutting off rear of HO diesel unit for rear of bridge. Adapting Revell 1/108 tug boat to front of it. This way bridge front fits between forward secondary turrets. Maybe whimsical, will see. Hey, its kit bashing.
attached picture of cutting HO unit.....