thanks fellas.
It was hoped that today would see a lot more work done after the shutdown brought about by much to and froing between the Yard and the Design Department, however Warehousing was completely wrong in their assurances that plenty of plasteel was available. So construction has once again stopped until the Purchasing Office can rectify that problem. The main circuitry routes, however have been completed and just requires the joining of the final sub-circuits once more of the superstructure is in place.
Current pic of the Centauria and in the background the incomplete hull of a new Red Star freighter that should enter service around the same time as the Centauria, (maybe, hopefully).