*grin* Doing every single fastener in CAD can be rather soul-sucking, too (speaking from experience here - 455 screws hung in their proper spatial locations in 7-1/2 hours. The only things that made it feasible is that I already had the hang-points set up and 'twas the same screw used all over.
on the other hand, it's finished and ready to go for the test hardware. If this and another project pan out as predicted, we're going to make some aftermarket vendor happy doing appropriate correction pieces for the V-22 engine nacelles. And it looks like I'll be in the middle of at least one, if not both.